2016-05-12 - 27108 - Service Request - Automate Korea Retail GR process #ProductionBreakFix #PurchaseOrders #Delivery
2016-05-12 - 27108 - Service Request - Automate Korea Retail GR Process
Problem Summary
Automate Korea Retail GR Process.
1. Stock transfer from SLOC to SLOC
2. Deliveries shall be created for Korea STO auto picked and PGI as soon as STO is created.
Admin Info
Purpose
|
Automate Korea Retail GR Process
|
Requested by
|
Babu Vanamali
|
Issue Date
|
05/13/2016
|
Resolved by
|
Adithya/Deepak
|
Resolved Date
|
05/17/2016
|
Document Status
|
Complete
|
Detailed Problem Description
(Include Screen Shots if required )
1. Stock transfer from SLOC to SLOC
Investigate an option to transfer stock from Sloc to Sloc in plant 0856.
Each Storage Location in plant 0586 is defined as a Physical Store location.
2. Deliveries shall be created for Korea STO auto picked and PGI as soon as STO is created.
a. Delivery shall be created Automatically for the STO
b. Quantity shall be picked and PGI shall happen automatically once the delivery is created.
Solution Analysis and Recommendations
(Include Screen Shots if required)
1. Stock transfer from SLOC to SLOC
Carried out investigation and found a IDOC with which can transfer post stock between storage location to storage location.
Understand that the Stores will not have the Material Number and Batch number maintained for that material in plant 0586 in ECC system, they would only send the UCC/EAN number and with the UCC EAN Number the IDOC shall processed and stock transfer shall happen.
Here is the data which would be sent form the system at store:
Plant, Issuing Storage Location, Receiving Storage Location, UPC Number & Quantity will be available in the file:
Recommended to use the below IDOC Details:
Basic Type /AFS/WMMBID02
Message Type WMMBXY
Here is the sample IDOC which is created for the validation in DEV 300: 393142
2.For auto delivery creation for STO deliveries , below configuration should be maintained.
2. For auto picking in the STO delivery, the below config is maintained.
. A new output type ZSTP is created with 0010 access sequence as below.
. The output ZSTP is assigned to output determination procedure as below.
. The condition record is maintained for ZSTP as below for Deliverytype/Shipping point combination.
3. For the auto PGI through batchjob the standard program WS_MONITOR_OUTB_DEL_GDSI is schedule with 0586 shipping point.
Resolution
The required configuration is maintained and testing is done in NED300 .
Release Information
Provide link here to Release Notes if Technical Objects were changed